Quick answer
Yes. A sewage system permit is required before a septic system is installed, replaced or significantly altered. In the City of Ottawa, permits are issued by the Rideau Valley Conservation Authority; elsewhere in Eastern Ontario by South Nation Conservation or the Mississippi Valley and Rideau Valley conservation authorities. DDS prepares the complete application and answers reviewer questions until approval.
Reviewed by Davis Patel, C.E.T., BCIN-qualified septic designer · Updated
No septic system can be installed, replaced or significantly repaired in Ontario without a permit. We take the paperwork off your hands: we assemble the complete application, including design drawings, calculations, site plan and supporting forms, and submit it to the right authority for your property.
In the City of Ottawa, septic permits are issued by the Rideau Valley Conservation Authority through the Ottawa Septic System Office (OSSO). Elsewhere in Eastern Ontario, applications go to South Nation Conservation, Mississippi Valley Conservation or the local municipality. We know each office’s requirements and answer reviewer questions directly with the Building Department and conservation authority.
We prepare and manage permit applications for new systems, replacements and renovations, including:
Site evaluation and design come first. The application is then submitted online, by email or in person, and the authority reviews it, typically within two to three weeks for a complete package. After approval, a licensed installer builds the system, the authority inspects it, and a Certificate of Completion is issued, which is usually needed before occupancy.
Septic Systems & Inspections for Rural PropertiesOntario Onsite Wastewater AssociationNo. Major repairs, tank replacements and leaching bed upgrades all require a permit under the Ontario Building Code, and the work must follow a design prepared by a qualified designer.
Within the City of Ottawa, the Rideau Valley Conservation Authority reviews applications through the Ottawa Septic System Office. Depending on your location, South Nation Conservation or Mississippi Valley Conservation may be the approval authority instead. We confirm the right office for your address.
A complete application is typically approved in about two to three weeks, though timing varies with the authority and the season. Spring and summer are busiest, so starting early helps.
Usually the authority will want the existing system assessed to confirm it can handle the extra flow and that setbacks are maintained. We prepare that assessment and, if needed, the upgrade design.
Some conservation authorities and municipalities offer limited incentive programs for failing system upgrades. Availability changes from year to year, so check with your local authority; we can point you in the right direction.