BCIN-qualified septic design for Ottawa & Eastern Ontario
Questions about your property or project? We're happy to help.

Quick answer
A lot grading plan is a drawing that shows a property's existing and proposed elevations and how surface water will drain away from the house and off the lot. Municipalities such as the City of Ottawa often require one with the building permit for new homes and many additions. DDS prepares grading plans alongside the septic layout so both approvals line up.
Reviewed by Davis Patel, C.E.T., BCIN-qualified septic designer · Updated
A lot grading plan shows how surface water will move across your property once construction is finished: away from the house, the septic bed and your neighbours. The City of Ottawa’s Grading and Drainage By-law requires an approved plan for many new homes and additions before a building permit is issued.
We prepare detailed grading and drainage plans that meet City of Ottawa standards and rural road drainage requirements. Because we also design septic systems, your grading plan and septic layout are coordinated from the start, avoiding the conflicts that happen when two consultants draw the same lot.
Each plan is prepared for review by the City and gives your builder clear targets on site:
Typical triggers include new home builds and rebuilds, larger additions, raised septic beds that change site drainage, and lot severances. If you are not sure your project needs a plan, send us the details and we will confirm against the City’s requirements.
In the City of Ottawa most new homes and many additions need an approved grading and drainage plan before the building permit is issued. Requirements differ in surrounding municipalities, so we confirm what applies to your property.
Yes, and it is the most efficient approach. One team handles the elevations, the bed and the drainage, so the drawings agree with each other and reviewers see a consistent package.
Heavy rain can saturate the leaching bed and reduce treatment or cause backups. Good grading that directs surface water away from the bed is one of the best ways to protect it.
Yes, though it may need a raised bed, a pump chamber or a tertiary unit. Careful grading design is especially important on these sites.
Popular